House of Duck
The slow yet steady journey for one Central Texas family with 5 acres and a strong desire to live a self-sustaining, debt free lifestyle.
Monday, June 8, 2015
Windows and doors!
Monday, April 20, 2015
Spring 2015 progress
Lots of great stuff has been happening around the House of Duck. After we got the roof all on I noticed a small leak on the original roof (building 1). When I built the building I never intended on making a home out of it so I didn't worry about the roof leaking a little. I also didn't put it on in a manner conducive to living in it. I just put 1x4 purlins across the rafters and screwed my tin to them. This allows condensation to form on the underside and drip on everything below. The proper way for a metal roof to go on is sheathing, roofing felt, then the tin. So after some ideas of just putting a bandaid on it to get by I decided we would be miles ahead if we went ahead and fixed it right.
I pulled off all the tin on building 1 and removed the purlins as well. While I had that all off, I went ahead and fixed the rafter angle to match the building 2 rafters. When I put the roof on building 2 I realized there was a noticeable bump between the two. Now was my chance to fix it.
So in a weeks time, I removed the old roof, foxed the rafters, put sheathing on building 1,put felt down and the replaced the tin. Managed to do all that for under $200.00. The bandaid fixes were all in the $800.00 range. I didn't manage to get any pictures when I was completely finished since I was rushing to get it done before dark each day after work.
In the first picture you can see the condensation. The second shows the roof with just felt.
Tuesday, November 25, 2014
So much for updates...
Since I can't seem to stay on top of regular updates maybe a few pictures will get everyone up to speed on our progress...
Tuesday, December 10, 2013
Slow boring process
Sunday, November 3, 2013
Change of Plans
This building is going to become the basic starting point of our house. It is 16x24, built very solid, and it has a good roof already. The plan is to add another 600sf onto the front side of this to bring it to our minimum 1000sf that is required. I have already put down several floor joists inside, but I didn't get any pictures. Maybe next weekend.
Originally I planned on a weekly update because I thought that would be easy enough. Turns out that is a bit ambitious. I will update occasionally, I plan on weekly but cant make any promises.
Wednesday, November 7, 2012
Beams
Each one is made of 9-2x10s glued and nailed together to make 40' beams.
That's all for now. Other priorities will be taking over for a few months so new posts will be rare.
Thanks for reading.
Friday, September 28, 2012
Going Up!
The one detail still not clear was how to build/support forms for the piers. I had read many stories in which the builder used the sonotube forms, but they all had holes that they could stick the tube down in and back fill around it to get support. My dirt/rock ground wouldn't even think about doing that. So I had to come up with some type of external support system for mine. This proved to be more difficult than it sounds, as my ground is full of protrusions making leveling complicated.
My piers are loosely 18"x6" thick bases with 12"diameter piers on top. I built 24-18"x18" forms, one for each hole. Then what I came up was using 2 pieces of 2x2 lumber that would span the 18" form width ,screwing these to the tube and then leveling the tube from there. All this while making sure the tube was suspended off the bottom of the hole. I struggled quite a bit with the first couple of piers but I quickly found a pattern and got better.
Since we have no water source yet, I brought in a 55 gallon drum of water to use for the concrete work. We only had to fill it once, and didn't use even half of the second drum worth. Many people tell me I should get a well drilled now and build later, but we plan on using rainwater as our only source of water. More on this in a post some other time.
I mainly work on the house Monday mornings for just a few hours, so for about 2 months, I would get 4 piers done a week. Sometimes I would get 3 done, once I got ambitious and got 6 done, but most times it was 4. We mixed each bag by hand in a wheelbarrow and this got old real quick, but we got through it.
Each pier also got a strap embedded into it which will be what we attach the beam to. I found the ready mad straps to be very expensive and began exploring other options. I found a 24" strap at the hardware store that I could bend to my desired shape easily enough. I made a jig at work out of some scrap lumber and just sat there bending away until I got 24 U shaped "brackets".
Now some progress pictures at varying times.
Here you can see my tube holding method, not pretty but it worked. You can also see my "bracket"
And this would be after they were all done. So glad to be finished with the concrete work. I later removed the large cactus in the corner there. I didn't want to contend with it later while under the house.
That's it for now. Almost ready for beams!
Thanks for reading.